My Responsibilities:
• Concept sketches and drawing set up
• Support the engineers (all disciplines)
• Performing technical duties to suitable time, quality and cost standards
• To work cooperatively within a team environment
• Support and develop junior staff
• Maintain a technical awareness
• Maintain appropriate professional and efficient standards.
• Comply with Quality System requirements
• Follow up the office procedures and standards.
• Coordinate all structure drawings with Architecture drawings
• Reporting to Architect found the missing data as required structure
• Develop Details Structural Drawings of Building Structures, Architecture
Bridges, Culverts, Drainage, Flyover and underpass
• Develop and maintain appropriate professional and efficient standards
• Develop and maintain generic drawing standard
• Detailed checking of all drawing work prior to submission of drawings.
ENGINEERING CONSULTANTS INTERNATIONAL (PVT.) LTD.

Project Photo










List of Projects:
I was involve in Structural Detail Drawings of many Project, some are mention the following:
• BUILDING WORKS
Structure
National Refinery Limited (Rehabilitation of Decorator Structure)
Sindh Assembly (Sindh Secreteate No.III old KDA Building)
Local Centre (Defense Houseing Islamabad Phase-II) school Building
SEPCOLE Raiwind Power Station (Extension of Gen Set.)
Mangla view resort (Boat Club)
Gawader Culture Complex
Envircrete Factory (Extension)
Nazim Office
Gawader Deep Project (Fire station / Security Building &
Under Ground Water Tank)
Plote No. 4-C Saaher Lane No.1. Ph VII D.H.A. Karachi
Karachi University Lab.
NED (Laboratory)
Curing Racks
School Building
Plote No.L-01. Block-16, Scheme 36, Gulistan-e-Jauhar Karachi
Liberty Mills Ltd.
Jamat Khana
Power House
Banglows
General Tire (tread and site wall line)
DSL Plant Project (Air intake system ) DHA
Stair Case for Avari Hotel Power Plant (Liberty)
Architectural
Curing Racks
PIA (Proposal PIC Hager for B-7777-200)
Gawader Culture Complex
Clifton Parking Building
Taiser Town - (Scheme-45)
Power Plant
M.Farooq Textile (Show Room Extension Admin Building)
Masjid
Nazim Office Uthal
Jamat Khana
Serina Building (At Uzbekistan)
School Building
SME Bank
P & G
Karachi University Lab.
Stair Case for Avari Hotel
Serena Paschid Architect
Electrical Works
Karachi University Lab
• BRIDGES / CULVERTS / CAUSEWAY/DRAIN WORKS
Structure
Pedestrain Under Pass (City District Government Karachi)
Ras Al Khor Crossing Contract-3B (Doha Dubai) Bridges
Ghaibi Drig Road Project (PPL) Culverts/Causeway
Hamria Town (Sharjah) Storm Water Drain
Hassan Abdal (Dualization of Hassan Abdal-Abbotabad to
Mansehra Section of N-35
M.A.Jinnah-KPT (Flyover) Package-1 (13 Bridges/Culverts)
Package-2 (17 Bridges/Culverts)
KNBP (Pedestrain Bridges) NHA-Islamabad
Indus River at Thatta (Activity Measurement Resut)
Jinnah Terminal to Pakistan Steel Mill Project (Culvert) CDGK
Jinnah International Airport (Reconstruction of ECHO Taxiway
and other Pavement (CAA)
KESC Chamber (CDGK) Rehabilitation of Sharra-e-Ghalib- Karachi
N-5 Highway Rehabilitation (Lahore-Gujrawala)
48 Bridges/Culverts/Pedestrain underpass
Makran Coastal Highway Project Pasni-Gawader Section
(Widening/New Bridges) NHA Islamabad
Azad Jammu & Kashmir (Bridges)
Karachi Coastal Highway (CDGK)
DHA Project (Water Drains)
Strom Water Drain
Lowari Tunnel (Bridges)
Natha Khan Flyover (At KCR Track)
Taiser Town (Drain / Culverts)
Mazarani Gas Field (Causeway)
Port Qasim (Culverts)-GPMP & S PKA
MDP (Drain / Culvert / Flyover / Bridges) CDGK
KESC Chamber (CDGK) Rehabilation of Sharra-e-Ghalib-Karachi
MOL-POGC-Islamabad (Culverts/Causeway/Slab Bridges)
Muzafarabad Airport Runway (Conceptual Design of Bridge
over nala Muzafarabad Airport
RBOD (Bridge) Irrigation & Power Department Government of Sindh
RSDP (Asian Development Bank) Communication and Works Department (Slab Bridges / Culvert / Drain / SC / BC) Shahra-e- Noorjehan (Drain System) and Box Culverts)
ECIL's STRUCTURE DEPARTMENT EMPLOYEES
CELEBRATE LUNCH PARTY IN OFFICE
Other Activities in Company:
ECIL's EMPLOYEES CELEBRATE PICNIC AT SEA SIDE WHICH IS ARRANGED FROM OFFICE